Work
My portfolio brings together my work as an Architect, BIM Manager, and project management professional, integrating conceptual design, architectural representation, construction drawings, BIM modeling, process optimization, and planning tools. Each project reflects my experience in design development, BIM coordination, and on-site supervision, presented through a minimal, elegant, and editorial visual approach, supported by a neutral and professional architectural palette.




Duplex_ Sto Domingo
Architect_Design and Regulatory Compliance
Santo Domingo, Heredia
Preliminary design for a two-story duplex that optimizes an urban lot with two functional apartments. Each unit includes an accessible bedroom compliant with Law 7600, an adapted bathroom, an integrated kitchen, and a double-height living–dining area, as well as a mezzanine,
an additional bedroom, and a private patio of over 18 m².
Sameena Depts
Architect_Design & Technical Documentation
Santa Cruz, Guanacaste
This project corresponds to a compact 40 m² residence. The focus was to create a flexible and cost-effective space where the outdoor areas serve as the main feature. The proposal includes a spacious bedroom, a full bathroom, an efficient kitchen, and a multifunctional living area, maximizing both the available space and budget.








Plaza Vizcaya
Resident Architect_Project Coordinator, and Construction Site Supervisor
San Joaquín, Heredia
A 4,549 m² commercial plaza consisting of retail units, common areas, and service spaces such as parking, restroom facilities, loading zones, a security booth, and technical rooms. I participated in on-site supervision and overall coordination to ensure proper execution aligned with the project’s specifications.
4D y 5D Apts Mauricio
Architect_Design & BIM Manager
Santo Domingo, Heredia
A project focused on the application of 4D and 5D BIM using an LOD 300 model to link scheduling and cost data to the three-dimensional model. A construction simulation and quantitative analysis were developed to improve planning and budget accuracy, resulting in an integrated model that facilitates coordination and informed decision-making.

Visualización de la ejecución de la obra



Visualización de la ejecución de la obra